XIUHUI PRECISION · DONGGUAN
Custom Zinc & Aluminum Die Casting for Complex Thin-Wall Parts
Xiuhui Precision (Dongguan Xiuhui Precision Technology Co., Ltd.) brings over 20 years of die casting experience to complex structures, thin-wall parts, cosmetic parts and precision zinc and aluminum alloy die castings. From tooling development and die casting to post-machining and surface finishing, we provide one-stop service. Our parts are widely used in consumer electronics, automotive, luggage and apparel, fiber-optic communication, cultural-creative gifts, premium drinkware and home appliances, with fast sampling and volume production from drawings or samples.
From drawing to delivery, in six steps
Drawings / Samples
Send drawings or physical parts, with material, quantity and finish requirements
DFM Review
Report within 3 working days — draft angles, wall-thickness jumps, shrinkage, air traps
Tooling
Mold design and build; runner, overflow and cooling laid out to part geometry
Trial & Approval
First articles in 5–10 days after the trial shot; the pilot batch starts after sign-off
Production
10–25 days after the pilot run is approved. Five zinc 88–168T, two aluminum 250–350T
Inspection & Delivery
Appearance, dimensions and salt spray checked to spec. Surface finishing by long-standing partners — scheduled and signed off by us
Selected work

Yerba Mate Cup Embossed Decorative Ring
Ring-slider tool controls the shut-off gap — no flash or pattern misalignment across a full-circumference emboss
View case →
Cosmetic Aluminum Alloy Housing
Low-silicon Mn-Mg alloy beats the anodizing colour variation and cold shuts on thin walls
View case →
Shaver Linear Motor Housing
Ejector-pin locking limits side-core expansion, holding ±0.02 mm without straightening
View case →Die Casting Capability Overview
20+yrs
Core team
die casting experience
820k–950kshots/mo
Combined aluminium + zinc output
10–25days
Standard production lead time
5–10days
Samples after trial shot
| Item | Aluminium die casting | Zinc die casting |
|---|---|---|
| Machines | TOYO 250T-350T | LK / ShiMi 88T-168T |
| Tie bar spacing | 584 × 584 mm (250T) / 650 × 650 mm (350T) | 357 × 357 mm (88T) / 486 × 486 mm (168T) |
| Max part size | 200 × 200 × 100 mm | 150 × 100 × 60 mm |
| Max part weight | Approx. 2 kg | Approx. 1 kg |
| Monthly capacity | 120k–150k shots | 700k–800k shots |
| Surface finishing | Baking paint (spray finishing), e-coating, electroplating, anodizing (low-silicon aluminium only) | |
| Minimum order | 3,000 shots per order, counted in shots — not converted into part quantity | |
All figures above are the regular range of our own equipment, and the largest aluminium part is produced on the 350T machine. What limits part size is clamping force and shot capacity, not mould space — tie bar spacing only decides whether a mould physically fits. Thin-wall, airtight or high-cosmetic parts are assessed individually against your drawing.
Common questions
Is Xiuhui a factory or a trading company?
We are an own-factory die caster in Dongguan. Aluminium and zinc die casting plus post-machining are completed in-house, and customer orders are not passed on to third-party production.
How long does sampling take, and how is the MOQ counted?
Samples are ready 5–10 days after the trial shot. MOQ depends on part weight and mould condition and starts at 3,000 shots — counted in shots, not converted into part quantity. Small pilot runs are negotiable.
What is the usual lead time?
10–25 days for standard production, depending on the post-machining steps and the complexity of surface finishing. Every operation is scheduled and coordinated by us, so hand-offs between stages stay stable and we keep firm control of delivery dates. These are reference times — we will always push to shorten them without compromising quality.
What if the part is too large or unusually shaped?
200 × 200 × 100 mm for aluminium and 150 × 100 × 60 mm for zinc are the regular limits of our own equipment. If your part exceeds them, send the drawing first — we will tell you whether it can be made and how to make it more cost-effective. If we cannot make it, we will say so straight away rather than keep you waiting.
Have drawings or a sample? Send them over
Tooling plan and production assessment within 24 hours. Not sure the part is feasible? Ask anyway.






