Xiuhui Precision — Custom Zinc & Aluminum Die Casting Parts

XIUHUI PRECISION · DONGGUAN

Custom Zinc & Aluminum Die Casting for Complex Thin-Wall Parts

Xiuhui Precision (Dongguan Xiuhui Precision Technology Co., Ltd.) brings over 20 years of die casting experience to complex structures, thin-wall parts, cosmetic parts and precision zinc and aluminum alloy die castings. From tooling development and die casting to post-machining and surface finishing, we provide one-stop service. Our parts are widely used in consumer electronics, automotive, luggage and apparel, fiber-optic communication, cultural-creative gifts, premium drinkware and home appliances, with fast sampling and volume production from drawings or samples.

Business Philosophy

Zinc alloy cross fitting with a machined threaded bore

Focus

Integrity — balance scale and weights

Integrity

Partnership — business handshake

Win-win

Previous slide
Next slide

From drawing to delivery, in six steps

1

Drawings / Samples

Send drawings or physical parts, with material, quantity and finish requirements

2

DFM Review

Report within 3 working days — draft angles, wall-thickness jumps, shrinkage, air traps

3

Tooling

Mold design and build; runner, overflow and cooling laid out to part geometry

4

Trial & Approval

First articles in 5–10 days after the trial shot; the pilot batch starts after sign-off

5

Production

10–25 days after the pilot run is approved. Five zinc 88–168T, two aluminum 250–350T

6

Inspection & Delivery

Appearance, dimensions and salt spray checked to spec. Surface finishing by long-standing partners — scheduled and signed off by us

Die Casting Capability Overview

20+yrs

Core team
die casting experience

820k–950kshots/mo

Combined aluminium + zinc output

10–25days

Standard production lead time

5–10days

Samples after trial shot

ItemAluminium die castingZinc die casting
MachinesTOYO 250T-350TLK / ShiMi 88T-168T
Tie bar spacing584 × 584 mm (250T) / 650 × 650 mm (350T)357 × 357 mm (88T) / 486 × 486 mm (168T)
Max part size200 × 200 × 100 mm150 × 100 × 60 mm
Max part weightApprox. 2 kgApprox. 1 kg
Monthly capacity120k–150k shots700k–800k shots
Surface finishingBaking paint (spray finishing), e-coating, electroplating, anodizing (low-silicon aluminium only)
Minimum order3,000 shots per order, counted in shots — not converted into part quantity

All figures above are the regular range of our own equipment, and the largest aluminium part is produced on the 350T machine. What limits part size is clamping force and shot capacity, not mould space — tie bar spacing only decides whether a mould physically fits. Thin-wall, airtight or high-cosmetic parts are assessed individually against your drawing.

Common questions

Is Xiuhui a factory or a trading company?

We are an own-factory die caster in Dongguan. Aluminium and zinc die casting plus post-machining are completed in-house, and customer orders are not passed on to third-party production.

How long does sampling take, and how is the MOQ counted?

Samples are ready 5–10 days after the trial shot. MOQ depends on part weight and mould condition and starts at 3,000 shots — counted in shots, not converted into part quantity. Small pilot runs are negotiable.

What is the usual lead time?

10–25 days for standard production, depending on the post-machining steps and the complexity of surface finishing. Every operation is scheduled and coordinated by us, so hand-offs between stages stay stable and we keep firm control of delivery dates. These are reference times — we will always push to shorten them without compromising quality.

What if the part is too large or unusually shaped?

200 × 200 × 100 mm for aluminium and 150 × 100 × 60 mm for zinc are the regular limits of our own equipment. If your part exceeds them, send the drawing first — we will tell you whether it can be made and how to make it more cost-effective. If we cannot make it, we will say so straight away rather than keep you waiting.

More questionsLocation · Advantages · Equipment & capacity · Order visibility · Surface finishingSee all →

Have drawings or a sample? Send them over

Tooling plan and production assessment within 24 hours. Not sure the part is feasible? Ask anyway.